Ingredients

Overview
Malt House
Mashing
Lautering
Boiling
Whirlpool
Cooling
Fermentation
Storage
Filtration
Bottling
Kegging

 

 
 

The wort is then moved into a fermentation vessel where yeast is added to initiate fermentation. The yeast converts the sugars from the wort into alcohol and carbon dioxide. Fermentation with bottom fermentation yeast takes place at between 7° C and 9° C and requires some 6 to 7 days, whereby the yeast eventually settles at the bottom of the vessel. Carried out with top fermentation yeast, the process takes 4 to 5 days at 18 – 20° C, with the yeast finally rising to the surface.


 
home  Brewery  Products  Advertising  Events  All about beer  HB partners  Press reports  Contact us  Legal notice  Shops